3D and 2D drawing analyze-production schedule arrange-material cutting-CNC programming-CNC Milling
Quantity
15,000 PCS
Surface treatment
Burr Removal
Drawing Formal
PDF IGS and STP
Quality Control
Quality Spot Checking before Shipping
Term of Payment
T/T and Paypal
Package
Wooden Box
Lead Time
14 Days
Delivery
By Sea
QUICK LINKS
PRODUCT
CONTACT
We focus on manufacturing high tolerance parts with different alloy materials such as aluminum, stainless steel, titanium, carbon steel etc.At the meantime, MYT offer various surface treatment including anodizing.